CMYA Finalist

Employer: McAleer & Rushe Contracts UK Ltd

Project: 35 Chancery Lane

Jamie Cassidy’s detailed knowledge of construction, pragmatic problem-solving and diligent can-do attitude made all the difference on this major cut and carve office block.

He leveraged his architectural background to interrogate the project drawings and flush out errors and unnecessary works. It enabled him to reduce the tonnage of steel required for the extensive temporary works. And by creating a bespoke facade support bracket, he dodged the bullet of having to pull back the building line.

He leveraged his architectural background to interrogate the project drawings and flush out errors and unnecessary works. It enabled him to reduce the tonnage of steel required for the extensive temporary works. And by creating a bespoke facade support bracket, he dodged the bullet of having to pull back the building line.